CHEMICAL

§ FLUORINE AROMATICS PLANT
Supply and installation of the control system; Revamping of the instrumentation:
- Detail design of the control system
- Supply of the complete control system
- Instrumentation installation
- Tuning and precommissioning

§ CONTROL SYSTEM INTEGRATION AMMONIA PLANT
-Design and Configuration DCS control system;
-Supply device backpanels;
-Supply CPU cabinet and Operator stations.

§ LOADING AND UNLOADING STATION FOR RAIL/ROAD TANKER
-Design mechanical and building works;
-Design and installation of instrumentation and electrical works;
-Design and integration DCS control system, safety system PES+F&G;
-Commissioning and start-up;
-Scheduled maintenance and service.

§ NEW NH3 STORAGE PLANT
-Design mechanical and building works;
-Design and installation of instrumentation and electrical works;
-Design and integration DCS control system, safety system PES+F&G;
-Commissioning and start-up;
-Scheduled maintenance and service.

§ LOADING RAMP ACH
-Design mechanical and building works;
-Design and installation of instrumentation and electrical works;
-Design and integration DCS control system, safety system PES+F&G;
-Commissioning and start-up;
-Scheduled maintenance and service.

§ FERTILIZERS PLANT
-Design of the “INFORMATION MANAGEMENT SYSTEM” through Siemens- Orsi system.

§ INTERMEDIATE PRODUCTION PLANT
-Adjust of the electrical and instrumentation plants;
-Design of the electrical part of the instrumental plants;
-Electrical and instrumentation detail design;
-Adjust of the existing DCS cabinets in the technical room;
-Supply new cabinet for discrete signal interface;
-Electrical works;
-Instrumentation works.

§ UREA AND AMMONIA PLANT - QUATAR
-Plant Revamping;
-Electrical design;
-Instrumental design.

§ NEW ETOX PLANT
-Basic and detail engineering development;
-I/O devices supply for control system;
-Instrumental installations;
-Project management